Need Help? +61 468 559 951

Gas Pre-Heating Tube Furnace up to 700oC @ 15L/m Flow Rate For Pyrolysis Reactors- OTF-1200X-25

In stock

OTF-1200X-25 is a gas pre-heating furnace for various pyrolysis reactors with hot gas outlets up to 700oC at a 15L/minute flow rate.

  • Estimated delivery time 14-30 days
  • 18 months warranty at Genuine Warranty Center.
  • Whats in the box: charging cable and block
SKU: gas-pre-heating-tube-furnace-up-to-700oc-15l-m-flow-rate-for-pyrolysis-reactors-otf-1200x-25

Product details

Power
Voltage:  208 – 240VAC, 50/60Hz
Power:2.4 KW
Heating furnace
Fibrous alumina for thermal insulation
Double-layer steel structure with air cooling
Split door design for easy installation of the heating coil
Heating zone length  400 mm
Furnace working temperature:  1100ºC max.
Heating coil

The heating coil is made of 1/4″ OD 310S alloy with a total length of 750 mm ( if straight )
1/4″ gas inlet and outlet with valves
The gas outlet temperature is monitored by the K type of thermal couple, and it is dependent on the gas flow rate as below ( Ar gas as standard )
Temperature Controller
30 programmable segments for precise control of heating rate, cooling rate, and dwell time.
Built-in PID Auto-Tune function with overheating & broken thermocouple protection.
Over-temperature protection and alarm allow for operation without attendant(s).
+/- 1 ºC temperature accuracy.
Dimensions
    620*300*450mm ( L x W x H)

Net Weight~32 Kg

Warranty One-year limited warranty (Consumable parts such as heating elements, processing tubes, and o-rings are not covered by the warranty, please order the replacement at related products below.)
Compliance
   
CE Certified
NRTL or CSA certification is available at an extra cost
WarningAttention: A two-stage pressure regulator must be installed on the gas cylinder to limit the pressure to below 3 PSI for safe operation. Click here to learn the installation of a gas regulator.
Back to Top
Product has been added to your cart

Select at least 2 products
to compare